Hospital - Brooksville, Florida-All American Portable Air
24/7 SERVICE & DELIVERY AVAILABLE
FREE QUOTES = CALL TODAY (866) 526-0365
MENU

Hospital

A leading construction firm specializing in building and remodeling hospitals contracted with us at All American Portable Air to provide climate control for a project they were working on in Brooksville, Florida. This particular construction company is noted for its exemplary work, and they were confident that our cooling and humidity control solution would promote the high standard of workmanship they are known for.

This particular health care facility consisted of a two-story high structure with 30,000 ft2 of floor space. In a hospital environment, climate control during construction or remodeling is of paramount importance to prevent the growth and spread of mold or mildew. Once construction on the building progressed to the point where all of the doors and windows were installed, we traveled to the jobsite with our equipment.

Leveraging our many years of experience in dealing with construction-related moisture, we configured a system to adequately and efficiently dry out the building materials. We installed and ducted four 25-ton air conditioning units, which we supplemented using a series of 10 fans to keep sufficient air circulation in all areas of the building. The 1,200,000 BTUs of air conditioning power kept the temperature and humidity within a consistent range to accelerate the drying process. This allowed all the materials to dry to correct specification the construction to stay on schedule.

In total, we supported this job site for a four-month period of time during the hot summer season. Contact us today if you are interested in learning more about this project or our construction drying capabilities.

Hospital Specifications

Job Requirement:
  • Cooling
  • Humidity Control
  • Duct Work
Location:
  • Brooksville, Florida
Duration:
  • 9 Days
Role:
  • Provided Air Conditioners and Fans to move air.
Situation:
  • New construction on a hospital building required cooling to protect from ambient humidity and high temperature.
Energy Required:
  • 1,200,000 BTU
Weight:
  • 25 ton

What Our Customer Say

“We used All American Portable Air twice in 2017, both were great experiences. Our office AC went out in the middle of summer and Eli was able to get a large unit /generator on the property the day after we spoke. He showed us how to use everything and helped set up everything up. We also used Eli to heat up space for our Christmas party. He was very patient with us through the planning process and invited us out to the shop to view all of the equipment. We had an elaborate setup with the heating tubing, but everything worked out great. I would recommend All American to anyone with heating and cooling needs.”

– Tamie S. | LEED Green Associate

“All American Portable Air over the past three to four years have supplied all over our large scale project temporary heating needs and done so in a most efficient and professional manner. One of the biggest headaches on construction sites during the winter months is spending time dealing with tanks and heating units that either always seem to be empty or guys are having to move around. AAPA has greatly simplified this through their higher quality heating units and large capacity tanks. The other benefits that due to the quality of the heaters we are able to heat more square footage will less heaters and tanks = fuel and money.”

– Jason Larkins | Orion Building Corp.

Have Questions? We’re Happy to Help!

To speak with one of our Climate Control Engineers, call us at (866) 526-0365 or Get a Quote by clicking on the button below…

Proudly Serving The Southeast US With 3 Warehouse Locations*

Click on the state below to learn more about our services in your area.

Proudly Serving The Southeast US With 3 Warehouse Locations*

Click on the state below to learn more about our services in your area.